GPC TankFarm in Hamriyah Freezone

Design works 

  • Detailing , preparation of isometric drawing, stress and surge analysis of pipe lines 
  • Design and preparation of fabrication drawings for the Pipe Rack, valve access platforms, crossover platforms, TTLR shed
  • Design and detailing of pipe sleepers, pump foundations and tank foundations
  • Pump House Layout and Overall GA

Construction works 

  • Complete Tank Farm piping works

  • Piping works towards Inner Berth & Main Berth

  • Installation , testing and commissioning of Valves, Pumps, Truck Loading Arms, Drum Filling unit, Weigh bridge, Hot Oil System 

  • Structural Steel works for Pipe Rack, Platforms, TTLR shed

  • Pipe Sleeper, civil works related to underground piping inside Tank Farm and for Berth lines

 

Storage Tanks for GPC in Hamriyah Free Zone

Construction of 16 Nos Of Storage Tanks for GPC in Hamriyah Free Zone

Gulf Petrochem FZC is planning to set up Storage Tank Terminal in Hamriyah Free Zone, Sharjah, UAE for the storage of a range of Petroleum/Petrochemicals/Base Oil products, for the captive as well as for third party usage / leasing. The facility will have a total of 37 storage tanks with an overall storage capacity of Approx 203,000 m³.

GPC awarded Albanna Engineering the construction of storage tank in Tank Farm 1 & 2 to handle Fuel Oil, Gas Oil and Bitumen and Fire water .

All storage tanks to be constructed as part of the Project will be designed according to API 650 – Welded Storage Tanks for Oil Storage and will have pressure relief devices that will comply with API 2000-Venting Atmospheric and Low Pressure Storage Tanks.

 

Civil, Mechanical and E&I Works Under Package 1B at EIL Jebel Ali Terminal

EPPCO International Ltd. (EIL) owns and operates Petroleum Storage Terminals 1, 2 and 4 at Jebel Ali. The terminals caters to the storage and distribution of petroleum products. The EIL terminals at Jebel Ali are located inside JAFZ (Jebel Ali Free Zone). The proposed works are to be executed at EIL Terminal 1. EIL proposes to carry out miscellaneous Civil & Structural, Mechanical and E&I work to improve the working conditions at the existing facilities.

Scope of Works

  • Removal of existing Additive Injection Skids and supply of new additive injection skids (2 Nos) for injecting Blue Dye to ULG 98 in Tank TK-116 and Green dye to ULG 95 in Tanks TK-115 and TK-119 with necessary connected piping, structural and E&I works.
  • Supply, Fabrication, erection of elevated walkways (approx. 340 RM and 2.5m high from ground level) with necessary local platforms and access to valve operating platforms within the tank farm 1 area in order to avoid the crossing over of the piping (which is at ground level) within the tank farm area during maintenance and inspection.
  • Providing access by means of interlocking pavement for frequently operating facilities like fast flush facility, stripping pump, pump house, Jet A1 pump house etc.
  • Entire tank farm 1 area’s existing loose layers of sand will be removed by manual excavation (200m depth) and filled with new sand to match existing topo level. On top of the new sand, gravel shall be laid for 75mm thickness throughout the tank farm 1 area.
  • Supply and erect cable trays on the raised walkways for running future electrical and instrumentation/control cables.
  • Updation of P&IDs, PFDs and piping plans of Terminals 1,2 and 4 for EIL’s HAZOP study.

EPC Contract for the OT2 Phase II Topside Facilities- Port Of Fujairah

Port of Fujairah intends to provide state of the art facilities at its Oil Tanker Terminal (OTT) for its users to transfer petroleum products from their respective terminals to ship vessels or vice versa. In view of this, POF is adding Berth 08 & Berth 09 Topside Facilities and Northern Matrix Manifold 2 (MM2) Topside Facilities to the terminal in addition to its existing terminal facilities which includes Berth 01 to Berth 07 and the Matrix Manifold 1 (MM1).

The works under the scope of this project comprises the Berth 08 and Berth 09 and Matrix Manifold 2 (MM2) Topside Facilities. This terminal shall be capable to load/unload small bunker barges to large oil vessel carriers (up to 180,000 DWT) handling a range of petroleum products including Fuel Oils, Crude Oils, Jet Fuels, Gas Oil, Naphtha’s, MTBE, Ethanol and Cutter Stock. The operations intended in this terminal include the following:

  • Ship to Shore Transfer.
  • Shore to Ship Transfer.  
  • Ship to Ship Transfer.  
  • Shore to Shore Transfer.  
  • Pigging of Dock lines.  
  • Stripping of Manifold Piping.


Scope of Works

  • Civil, MEP and Structural Works.
  • Mechanical Works.
  • Piping Works.
  • Electrical and Instrumentation Works.
  • Fire Fighting & Protection and Alarm System works. 

Compressed Air Pipeline - Inner Ring Main

DUBAL awarded the compressed air pipeline project to Albanna Engineeringto inter connect two existing main air supply lines & in between tapping for potlines 1 , 3, 5 & 6 at Jebel Ali.


Scope includes

  • Design, Supply
  • Installation
  • Testing
  • Commissioning of 12” compressed air pipeline including pressure gauges, valves, supporting structures and civil work

Upgrading EMARAT LPG Facility at JAFZA

Emarat awarded the Upgrading of LPG bottling facility project to Albanna Engineeringfor upgrading of LPG Bottling Facility including construction of truck loading facility at Jebel Ali Terminal.

Overall Project Work is being carried out at

  • LPG Cylinder Filling Area
  • LPG Truck Loading Gantry
  • LPG Pump house Area